Projects

Projects Description Manager Posts Members Status Join Link
Metro Phase 2 - Yellow Line (RV Road - Bommasandra)

The Yellow line will be from RV Road – Bommasandra covering a distance of 19.143 kms.

Type: Elevated
Depot: Hebbagodi (39.3 acres)
Stations (16): Rashtreeya Vidyalaya Road, Ragigudda,...

USN Admin 0 1 Active
Metro Phase 2 - Purple Line extension (Mysore Road – Challaghatta)

The extension of Purple line from Mysore Road to Challaghatta will cover a distance of 8.814 km
Type: Elevated
New Depot: Challagatta (38.9 acre;...

USN Admin 0 1 Active
Metro Phase 2 - Green line extension (Hesaraghatta Cross - Madavar)
The extension of green line from Hesaraghatta Cross (erst. Nagasandra) to Madavar (erst. BIEC) will cover a distance of 3.031 km

USN Admin 0 1 Active
Metro Phase 2 - Purple line extension (Baiyyappanahalli to Whitefield)

Purple Line extension from Baiyyappanahalli to Whitefield, covering a distance of 15.257 kms.
Type: Elevated
New Depot: Whitefield (44.8 acres; for entire line)
Stations (13):...

USN Admin 0 1 Active
Metro Phase 2 - Purple Line extension (Mysore Road – Challaghatta)

The extension of Purple line from Mysore Road to Challaghatta will cover a distance of 8.814 km
Type: Elevated
New Depot: Challagatta (38.9 acre;...

USN Admin 0 1 Active
Metro Phase 2 - Purple line extension (Baiyyappanahalli to Whitefield)

Purple Line extension from Baiyyappanahalli to Whitefield, covering a distance of 15.257 kms.
Type: Elevated
New Depot: Whitefield (44.8 acres; for entire line)
Stations (13):...

USN Admin 0 1 Active
Metro Phase 2 - Green line extension (Hesaraghatta Cross - Madavar)
The extension of green line from Hesaraghatta Cross (erst. Nagasandra) to Madavar (erst. BIEC) will cover a distance of 3.031 km

USN Admin 1 1 Active
Metro Phase 2 - Pink Line (Gottigere - Nagawara)

The phase 2 of Namma Metro will see the network expand by a distance of 72.095 km. As per the state government, this part of the project will get completed...

USN Admin 0 1 Active
Metro Phase 2 - Yellow Line (RV Road - Bommasandra)

The Yellow line will be from RV Road – Bommasandra covering a distance of 19.143 kms.

Type: Elevated
Depot: Hebbagodi (39.3 acres)
Stations (16): Rashtreeya Vidyalaya Road, Ragigudda,...

USN Admin 0 1 Active
Metro Phase 2 - Green line extension (Yelachenahalli to Anjanapura)

The Green line from Yelachenahalli to Anjanapura, which will be 6.29 km in distance is being constructed in Phase 2 development of Namme metro.n

This elevated metro line will have...

USN Admin 0 1 Active
BEL and Kuvempu circle underpass BEL and Kuvempu circle underpass - details as on 30.12.2011 Sl.No. Items USN Admin 0 1 Active
Central Silk Board Junction Redevelopment

The signal-free corridor project for redeveloping the Central Silk Board intersection, to be built along the Metro corridor from Ragigudda to Silk Board, was to be built in two-and-a-half years....

USN Admin 0 1 Active
TenderSURE project - 24th Main JP Nagar

TenderSure project for 24th Main JP Nagar

USN Admin 0 1 Active
NICE Road

The Gottigere junction of NICE Road is the last remaining junction to be built, to make the road between Electronic City and Tumkur Road fully intersection-free. But this junction has...

USN Admin 0 1 Active
Flyover at Yeshwantpur Circle

Flyover work is completed and traffic allowed.

USN Admin 0 1 Active
Pedestrian subway at City Market

Physical Progress : 45%. Status : 13 precast elements placed, Raft 16.25 mtrs completed. 81 elements Precast completed at yard, flat roof casted. Issues : UGD line has to be...

USN Admin 0 1 Active
Puttenahalli Underpass

The underpass is open for traffic.

The Rs 23-crore project began in May 2008 to ease traffic flow from areas like J P Nagar, Puttenahalli and Kothunur. The underpass on...

USN Admin 0 1 Active
Jayadeva Flyover Reconstruction

Per BMRCL’s plans, the flyover has to be demolished to facilitate construction of two new metro lines: R.V. Road to Bommasandra, and Gottigere to Nagawara. An interchange station will be...

USN Admin 0 1 Active
Sewage Diversion at Puttenahalli lake

The raw sewage going into Puttenahalli lake from Nataraja Layout is being fixed as of August 2019.

Months long appeal of the PNLIt trust is finally being listened to by...

USN Admin 0 1 Active
Arekere lake rejuvenation

Three years after Bangalore Development Authority (BDA) took up rejuvenation of Arekere lake, it continues to be counted among one of the most polluted water bodies in Bengaluru. As of...

USN Admin 0 1 Active
Bellandur Flyover Bellandur Flyover- details as on 17.12.2011 Sl.No. Items Project Details ... USN Admin 0 1 Active
HSR Layout Flyover along Outer Ring Road HSR 14th Main Flyover- details as on 17.12.2011 Sl.No. Items USN Admin 0 1 Active
Mahadevapura Flyover Devarabeesanahalli Flyover- details as on 17.12.2011 Sl.No. Items ... USN Admin 0 1 Active
Detailed Project Report for Arakere

The Bangalore Development authority has drawn up a detailed project report (DPR) for the renovation of Arakere lake. The DPR has been prepareed by STUP Consultant, at an estimated cost...

USN Admin 0 1 Active
Veerannapalya junction flyover Veerannapalya junction Flyover- details as on 17.12.2011 Sl.No. Items Project Details ... USN Admin 0 1 Active
Nayandahalli Flyover along ORR and Mysore road Nayandahalli junction Flyover- details as on 05.01.2012 Sl.No. Items Project Details ... USN Admin 0 1 Active
Kalyananagar junction flyover Kalyananagar junction Flyover- details as on 30.12.2011 Sl.No. Items Project Details ... USN Admin 0 1 Active
Underpass at Tagore Circle Status : Earth work excavation on southern side of K.R.Road near Police Station started. USN Admin 0 1 Active
Devarabeesanahalli Flyover Devarabeesanahalli Flyover- details as on 17.12.2011 Sl.No. Items ... USN Admin 0 1 Active
Kadubeesanahalli underpass Kadubeesanahalli Flyover- details as on 17.12.2011 Sl.No. Items ... USN Admin 0 1 Active