HOT TOPICS
SPOTLIGHT AGENCIES
Mumbai has MRVC / MUTP, Bangalore still waiting
Sanjeev - 29 December, 2010 | Bangalore | railways | CRS | Citizen Reports | Transportation | public transport | Namma Railu | Commuter rail
Here you can see how Mumbai Rail Vikas Corporation (MRVC), joint venture of Indian Railway & Govt. of Mharastra under MUTP :
Partners in MUTP -
- Government of Maharashtra (GOM)
- Indian Railways (IR)
- Mumbai Metropolitan Region Development Authority (MMRDA)
- Municipal Corporation of Greater Mumbai (MCGM)
- Bombay Electric Supply and Transport Undertaking (BEST)
http://www.mmrdamumbai.org/projects_mutp.htm
Salient Features of MRVC project, this what needed for Bangalore Commuter Rail
http://mrvctest.ucs.in/mrvc/index.php?hidAction=display&category_id=30&subcat_id=32&subsubcat_id=23
Here you can see how the Phase-1 & Phase-2 are planned and project has been broken down to each technical aspect.
http://mrvctest.ucs.in/mrvc/index.php?hidAction=display&category_id=31&subcat_id=38
objectives and benefits of MUTP Phase-1 & 2 listed
http://203.176.113.182/MRVC/intr.html
Here Railway authorities are bringing down their own rail bridge at Khar for improvements at Mahim station. Here you can see how tarcks are laid so that spacing is done properly and even Rail staff residences are beeing brought down to make the place for tracks.
When we look at this, Bangalore is no where near the public transport, even though we consider BMTC is doing good job. Coming up NAMMA METRO is small relief for Bangalore citizens.
The way project on Commuter Rail handeled by SWR & GoK, Bangalore will suffer on efficient public transport. As BMTC may try to do good job, but average speed on the road gets reduced over the period, slow progress of METRO will result in worst Traffic conditions for Bangalore. Even HSRL will takes its own time ( 5 - 6 yrs from now ), METRO phase-1 to complet in another 3-4 yrs, imagine the condition of roads by then???
Bangalore can claim only having best internet bandwidth, worst in public transport after some time. Its high time, integrated approach with MTRO, Commuter Rail, BMTC & Mono Rail required.
COMMENTS
Mumbai: Suburban trains travel thrice the earth's circumference
Sanjeev - 8 December, 2014 - 08:47
Mumbai: Suburban trains travel thrice the earth's circumference daily!
Officials from Central and Western Railways showed the Railway Board some mind-boggling numbers last week; local trains cover a total distance of 1.14 lakh train km, which is nearly thrice the earth’s 40,075-km circumference
Officials from Central Railway (CR) and Western Railway (WR) presented some astounding facts about the suburban train system to the Railway Board members last week in a meeting. For instance, the total distance covered by all local trains on both WR and CR is almost thrice the circumference of the earth
The reality of the overburdened suburban rail system is this CR trains run 69,516 train km with 121 rakes, while WR plies 44,568 train km every day operating with 84 rakes. Both the lines combined cover 1,14,084 train km, which is nearly thrice the circumference of the entire earth which stands at 40,075 km.
On the Main line, CR runs 45,220 km with 75 rakes while WR covers 44,429 train km with 83 rakes. “Our trains run longer journeys every day on the suburban section with limited trains,” said a CR official.
Over the last few days, there have been several problems on CR, which is creating hassles for commuters. Authorities blame them on the old rakes powered by the obsolete 1,500-volt supply system.
CR has nearly 30 DC rakes that ply on both Main (CST-Karjat/ Kasara/Khopoli) and Harbour lines (CST-Panvel/Andheri and Thane-Vashi and Turbhe-Nerul sections). WR, on the other hand, runs entirely on 25,000-volt AC supply. Despite this, CR takes lesser time to cover the longest distance as compared to its equivalent on WR.
The CST-Kasara journey (121 km) takes 2 hours 10 minutes, as compared to 2 hours 49 minutes taken by a Churchgate-Dahanu train (124 km). Similarly, a Churchgate-Virar fast train takes 102 minutes, while a CST-Ambernath local train takes 99 minutes both distances are 60 km.
Central Railway Western Railway Bangalore Suburban Rail
Avg Train Km per rake 575 530 300
Suburban Station 76 36 40
Rakes in Services 121 84 04
Total Route Km 319 183 440
How City Depends Its Mumbai's life line Its most neglected
PRAJA.IN COMMENT GUIDELINES
Posting Guidelines apply for comments as well. No foul language, hate mongering or personal attacks. If criticizing third person or an authority, you must be fact based, as constructive as possible, and use gentle words. Avoid going off-topic no matter how nice your comment is. Moderators reserve the right to either edit or simply delete comments that don't meet these guidelines. If you are nice enough to realize you violated the guidelines, please save Moderators some time by editing and fixing yourself. Thanks!