Request for integrating YPR-ANEKL Passengers with Namma Metro at Baiyyappanahalli

187

ramesh_mbabu - 13 August, 2013 | Bangalore | CRS | Namma Metro | Integration | Namma Railu | Commuter rail | Multi Modal Transport

The following trains run on this route

No. Name Type From Dep ↑↑ Avg To Arr Avg Duration Halts Dep Days Distance 06591 Yesvantpur - Hosur P... DEMU YPR* 06:30 +7 AEK 07:45 +11 1h 15m 5   M T W T F S 52 km   06593 Yesvantpur-Hosur Pas... DEMU YPR* 14:55 +2 AEK 16:14 +1 1h 19m 5   M T W T F S 52 km   56242 Yesvantpur Salem pas... Pass YPR* 16:05 +6 AEK 17:18 +15 1h 13m 6 S M T W T F S 52 km   76553 Bangalore Dharmapuri... DEMU SBC* 18:30 +19 AEK 19:23 +37 0h 53m 6   M T W T F S 45 km  

... but miss the integration with Namma Metro at Baiyyappanahalli where the metro and rail stations are adjacent. The following are the list of trains running in the reverse direction.

 

No. Name Type From Dep ↑↑ Avg To Arr Avg Duration Halts Dep Days Distance 76554 Dharmapuri Bangalore... DEMU AEK 06:45 +25 SBC* 08:10 +12 1h 25m 6   M T W T F S 45 km   06592 Hosur-Yesvantpur Pas... DEMU AEK 08:29 +19 YPR* 09:50 +8 1h 21m 5   M T W T F S 52 km   56241 Salem Yesvantpur pas... Pass AEK 08:45 +42 YPR* 10:45 +7 2h 0m 6 S M T W T F S 52 km   06594 Hosur-Yesvantpur Pas... DEMU AEK 18:10 +16 YPR* 19:25 +14 1h 15m 5   M T W T F S 52 km  
Rerouting these trains to touch the Baiyyappanahalli station will help increase the usability of these trains, passengers will be able to change over to other trains heading to SBC and onward to Mysore or Whitefield directions easily. Additionally it provides integration with Namm Metro, helping them to traven upto MG Road currently.



 

 

 

 


COMMENTS



  1. Bagmane Tech Park ~ 2 kms


  2. RMZ Infinity ~ 1 kms


  3. Easy connectivity and change over for passengers on Whitefield-SBC line and beyond.


  4. Huge residential area on OMR axis


 apart YPR to other PT. BYPL is closest to high density BMTC route as well.  

# Code Station Name ¶ Arrives Avg Departs Avg Halt PF Day# Km Speed Elev Zone Address 1 YPR» Yesvantpur Junction»      - 06:20 06:30 +7   1 1 0.0 22 919m SWR Bengaluru-560022, Karnataka 2 LOGH Lottegollahalli    06:25 06:42 - 06:26 06:43 - 1m 1 1 4.3 25 912m SWR Bengaluru-94, Karnataka 3 HEB Hebbal    06:36 06:50 +7 06:37 06:51 +13 1m 1 1 7.2 30 899m SWR Bengaluru, Karnataka 4 BAND Banaswadi    06:52 07:06 +9 06:54 07:07 +12 2 1m -- 1 14.7 53 915m SWR Bengaluru, Karnataka 4.1 BYPL Baiyyappanahalli    07:11 - 07:11 -     1 18.0  53 913m SWR Bengaluru-560038, Karnataka 4.2 BLRR Belandur Road    07:08 07:22 - 07:09 07:22 -     1 28.3  53 874m SWR Bengaluru, Karnataka 5 CRLM Karmelaram    07:15 07:26 +12 07:16 07:27 +14 1m -- 1 31.5 82 901m SWR Bengaluru, Karnataka 6 HLE Heelalige    07:26 07:35 +13 07:27 07:36 +13 1m -- 1 42.4 65 885m SWR Bengaluru, Karnataka 7 AEK• Anekal Road•    07:39 07:45 +11 07:40 07:46 +12 1m -- 1 52.2 61 911m SWR Bengaluru-562106, Karnataka 8 HSRA Hosur    07:55 08:00 +14   -   3 1 66.5 - 895m SWR Hosur, Tamil Nadu

 

# Code Station Name ¶ Arrives Avg Departs Avg Halt PF Day# Km Speed Elev Zone Address 1 YPR» Yesvantpur Junction»      - 15:35 14:55 +2   -- 1 0.0 22 919m SWR Bengaluru-560022, Karnataka 2 LOGH Lottegollahalli    15:40 15:07 - 15:41 15:08 - 1m 1 1 4.3 34 912m SWR Bengaluru-94, Karnataka 3 HEB Hebbal    15:51 15:13 -1 15:52 15:14 +4 1m 1 1 7.2 35 899m SWR Bengaluru, Karnataka 4 BAND Banaswadi    16:07 15:27 +0 16:08 15:28 +4 1m -- 1 14.7 42 915m SWR Bengaluru, Karnataka 4.1 BYPL Baiyyappanahalli    15:33 - 15:33 -     1 18.0  42 913m SWR Bengaluru-560038, Karnataka 4.2 BLRR Belandur Road    16:20 15:47 - 16:21 15:47 -     1 28.3  42 874m SWR Bengaluru, Karnataka 5 CRLM Karmelaram    16:27 15:52 +4 16:28 15:53 +6 1m -- 1 31.5 73 901m SWR Bengaluru, Karnataka 6 HLE Heelalige    16:37 16:02 +4 16:38 16:03 +8 1m -- 1 42.4 54 885m SWR Bengaluru, Karnataka 7 AEK• Anekal Road•    16:47 16:14 +1 16:48 16:15 +13 1m -- 1 52.2 57 911m SWR Bengaluru-562106, Karnataka 8 HSRA Hosur    17:05 16:30 +3   -   3 1 66.5 - 895m SWR Hosur, Tamil Nadu

 

# Code Station Name ¶ Arrives Avg Departs Avg Halt PF Day# Km Speed Elev Zone Address 1 YPR» Yesvantpur Junction»      - 16:05 +6   6 1 0.0 52 919m SWR Bengaluru-560022, Karnataka

PT Integration Potential at Byappanahalli

The Banaswadi station is 14 Kilometers away from the previous station (Belandur Road). If the trains can take the detour given in Green, there is another station at 10 Kms, additionally  it helps in seemless integration with other Railway routes, Metro & High density BMTC Routes 

Implementation within realm of possibility

xs400 - 12 September, 2013 - 09:14

Thanks ramesh_mbabu

I dont know about the green re-routing, but your earlier idea of tweaking YPR-ANEKL route should be easily possible and like you said, the huge catchment area means many will be able to use the service and take pressure off other infrastructure.

This suggestion can be pushed forward for early implementation and can be test bed for other routes.

The green line exists already

ramesh_mbabu - 12 September, 2013 - 10:13

I remember part of these green line getting used by train from YPR and bound to Chennai. The SWR folks objects the re-routing citing a signalling/cross-over issue. If that is right, it should have been applicable to the YPR-Chennai trains as well.

Date of Receipt : 15 Aug 2013 Received by : Ministry of Railways, ( Railway Board) Forwarded to : Chief Operations Manager. Contact Address : Office of General Manager,     Club Road, Keshwapur,     Hubli.580023 Contact Number : 08362326100 Grievance Description : A smaller stretch of Bangalore Metro is in operation for last couple of years. The Baiyyappanahalli Stations of both metro and Indian Railway emerged as an integration point for various modes of public transport as the stations are adjacent to each other and is close to a high density City Bus service. Many of the passenger trains do not stop at this Railway Station, a list of such trains are given below, there could be many more such trains. 06591 Yesvantpur - Hosur Passenger 06593 Yesvantpur-Hosur Passenger 56242 Yesvantpur Salem Passenger Request the competent authorities to take measures so that the purpose of integration of various public transport is served helping passengers. Current Status : CASE CLOSED Date of Action : 04 Oct 2013 Details : At present, stoppage for 11 pairs of Passenger trains and one pair of express trains have been provided at Baiyyappanahalli. It is not feasible to provide stoppage for additional trains at Baiyyappanahal

 

Thanks Ramesh making efforts

Sanjeev - 5 October, 2013 - 03:18

Baiyyappanahal  has good potential to become Trnsport Hub if the UDD / GOK, UDD / GOI , Indian Railway,  BMRCL,  KSRTC & BMTC come together and  contribute.  

Its the inefficency of SWR to put proper automatic signalling,  tracks,  Platforms, Low capacity Railway Engines are the reasons   every time SWR comes out say no.

Its equally unfortunate that even MP's, MLAs and Corporators do not take any interest on these.

Even look at  how people travell near Beniganhalli ( Near Baiyyappanahal ) underpass to reach old Madras Road  and to cross the road whch will help vechiles and even Pedestrians to cross.

For this if BBMP & SWR should build big Under Pass starting from Kasturi Nagar and  even  underpass should cross Old Madras Road.  If this is done,  lot of Trafic going towards KR Puram will get diverted.

All the while I was thinking the IR is run by centralized Railway Board, imposing diktats from Delhi. This was the impression I got from the way the new trains/time table changes/extension of trains etc. are declared in railway budgets. Looking at the way the request was forwarded to Operational Manager, SWR Hubli, it gives an indication that operational details are decided at zonal head quarters and Railway Board just consolidates them. Look at the reply from that babu, without touching the actual requirement he has given a generic reply.

At present, stoppage for 11 pairs of Passenger trains and one pair of express trains have been provided at Baiyyappanahalli. It is not feasible to provide stoppage for additional trains at Baiyyappanahal.

As if the capacity of a 4 line 2 Platform station is 12 pairs of trains a day. Just have a look at the KR Puram station few kms away, with similar capacity it has stoppages for many other trains. The funniest part is, he is indirectly asking to use the 2 pairs of other passengers train that runs on YPR-SBC route or get down at YPR and travel in other trains to BYPL. Some times waiting for the next day to catch the connecting train.

If this is the knowledge an Operational Manager has about the running of trains under his fiefdom, it is high time this ineffective monstrous govt. body is cut into pieces and privatized. Let a professional body decides the valuation of current infrastructure owned by IR and decide the share it can have on new entities. Let them pay the usage charges to the new entities for running the trains (if at all interested in it) at the same time open it up for other interested parties. Let it be decided on commercial interests, rather than by the access to Binny Mills land or sharing the infra cost by state governments etc. If airports, aviation, radio, TV, banking, telecom etc. can be opened for private players this is defenitely another area that can live without services provided by the inefficient goverment entity.

There are experiments both in India and outside from where lessons can be learnt. Konkan Railway, Metros in various Indian cities and http://en.wikipedia.org/wiki/Privatisation_of_British_Rail.

Bangalore City - Dharmapuri Passenger

xs400 - 11 October, 2013 - 07:45

After reading this post by ramesh_mbabu , I travelled by train # 76553 from SBC to ANEK. Took a total of 4 hours to reach my destination! (versus 2 hours by Bus). The only plus point was the ticket was only Rs 15/- + bus to majestic Rs 12/- + bus home (private bus) 8/-  the total was Rs 35/- ; while the Volvo fare was Rs 100/- . Note that the Volvo service is not available after 4 PM - due to good coordination between the babus who think no one needs to travel after sunset.

The train starts late ( typically 30 minutes according to erail.in). On the day I travelled it was late departing SBC by 20 min and reached Anekal 1 hour late. At Bypanahalli the train waited for 2 express trains to pass.

Great potential, but unlikely to be realized without political direction.

 


PRAJA.IN COMMENT GUIDELINES

Posting Guidelines apply for comments as well. No foul language, hate mongering or personal attacks. If criticizing third person or an authority, you must be fact based, as constructive as possible, and use gentle words. Avoid going off-topic no matter how nice your comment is. Moderators reserve the right to either edit or simply delete comments that don't meet these guidelines. If you are nice enough to realize you violated the guidelines, please save Moderators some time by editing and fixing yourself. Thanks!