HOT TOPICS
SPOTLIGHT AGENCIES
Figure 1 Mass Transport Corridors admin123 - 14-NOV-2007
Figure 1 Mass Transport Corridors Full View |
Table 2 Summary Of Proposed Projects And Cost Estimates admin123 - 14-NOV-2007
|
4. The Proposed Traffic And Transportation Plan admin123 - 14-NOV-2007
4. THE PROPOSED TRAFFIC AND TRANSPORTATION PLAN |
5. Institutional Strengthening admin123 - 14-NOV-2007
5. INSTITUTIONAL STRENGTHENING |
admin123 - 14-NOV-2007
3. TRANSPORT DEMAND ANALYSIS |
admin123 - 14-NOV-2007
1. PROBLEMS AND ISSUES |
CTTP Bangalore Executive Summary admin123 - 14-NOV-2007
Karnataka Urban Infrastructure Development And Finance Corporation Executive Summary
|
2. The Preferred Strategy For Transport Development admin123 - 14-NOV-2007
2. THE PREFERRED STRATEGY FOR TRANSPORT DEVELOPMENT In order to prepare the Comprehensive Transport Plan the following policy measures have been considered: a) Extension of mass transport system to provide wide coverage and transport integration with other modes of transport. |
blrsri - 13-NOV-2007The OMR users will face the benniganhalli RUB bottle neck every day. The reason is the RUB is a two lane bridge which caters to a 6 lane traffic! This leads to a miniumum of 30-40 min of clutch banging session and after that people have to endear another jam on the ORR below the cable stayed bridge because of a truck break down. At the RUB, the cops have implmented innovative traffic handling where they stop traffic on one side for 20 min to let the other side use the bridge..this is not done regulary so we end up in a jam most days.. Is there any plans of upgrading this bridge? |
BG Road Hosur Road shortcut and BBMP's road work silkboard - 12-NOV-2007
- Improvements and Asphalting to road from Begur road to Hosur main road via Hongasandra Garvebavipalya (1st Main Road) - 30 lakhs. - Improvements and Asphalting the Devarachikkanahalli main road (Begur road connecting Vijayabank layout) - 30 lakhs. |