Posts : Traffic

Figure 1 Mass Transport Corridors

admin123 - 14-NOV-2007

Figure 1 Mass Transport Corridors
(click on images for higher resolution)

Full View

Table 2 Summary Of Proposed Projects And Cost Estimates

admin123 - 14-NOV-2007

4. The Proposed Traffic And Transportation Plan

admin123 - 14-NOV-2007

4. THE PROPOSED TRAFFIC AND TRANSPORTATION PLAN

5. Institutional Strengthening

admin123 - 14-NOV-2007

5. INSTITUTIONAL STRENGTHENING

3. Transport Demand Analysis

admin123 - 14-NOV-2007

3. TRANSPORT DEMAND ANALYSIS

1. Problems And Issues

admin123 - 14-NOV-2007

1. PROBLEMS AND ISSUES

CTTP Bangalore Executive Summary

admin123 - 14-NOV-2007

Comprehensive Traffic and Transportation Plan For Bangalore - CTTP Bangalore
Karnataka Urban Infrastructure Development And Finance Corporation
 

Executive Summary
RITES Ltd. Oct 2007

 

2. The Preferred Strategy For Transport Development

admin123 - 14-NOV-2007

2. THE PREFERRED STRATEGY FOR TRANSPORT DEVELOPMENT

In order to prepare the Comprehensive Transport Plan the following policy measures have been considered:

a) Extension of mass transport system to provide wide coverage and transport integration with other modes of transport.

OMR jam's

blrsri - 13-NOV-2007

The OMR users will face the benniganhalli RUB bottle neck every day. The reason is the RUB is a two lane bridge which caters to a 6 lane traffic! This leads to a miniumum of 30-40 min of clutch banging session and after that people have to endear another jam on the ORR below the cable stayed bridge because of a truck break down. At the RUB, the cops have implmented innovative traffic handling where they stop traffic on one side for 20 min to let the other side use the bridge..this is not done regulary so we end up in a jam most days.. Is there any plans of upgrading this bridge?

BG Road Hosur Road shortcut and BBMP's road work

silkboard - 12-NOV-2007

A good shortcut from Banerghatta road to Hosur road might be possible sometime soon. I dont really know the location of all the villages and layouts mentioned, but looks like BBMP is upgrading and asphalting a lot of roads in the Bommanahalli/Begur, Arekere area. Sample some:

- Improvements and Asphalting to road from Begur road to Hosur main road via Hongasandra Garvebavipalya (1st Main Road) - 30 lakhs.

- Improvements and Asphalting the Devarachikkanahalli main road (Begur road connecting Vijayabank layout) - 30 lakhs.